Projects grow.
Site updates break.
Money gets stuck.
BrickVox fixes that.

Turn WhatsApp voice notes into daily site intelligence — without another app. Your engineers keep doing what they already do. You get structured records, delay logs, and evidence that holds up.

Site intelligence. Before the problem compounds.

No app. No training. Engineers keep using WhatsApp.

Daily Progress Report
Tower A — Block 3
Date
22 Aug 2026
Labour12 workers
ActivitySlab shuttering
Progress680 sq ft
DelayConcrete truck — 2 hrs
Evidence3 photos + voice
03 — Report
✓ Timestamped ✓ Searchable ✓ Claimable
04 — Intelligence · Tower A
Live
3 delay events — 5.5 days total impact
Delay register · Client-caused 3.5d
Labour invoiced 220 days. DPRs show 181.
Overbilling detected · ₹1.2L exposure
Concrete: 340m³ logged vs 290m³ in JMB
Evidence ready · Claims pack available
Progress: 56.7% complete. On schedule.
Last updated · Today 09:42 AM
90s
A voice note is all it takes. No form. No login. The DPR arrives before the engineer leaves the gate.
Day 0
Every delay, quantity, and labour count is recorded the day it happens — not reconstructed six weeks later.
7 days
One site. One free trial. That's the window we ask for. If the output doesn't prove itself, stop.
The reality right now

Your site already produces the data. It's just trapped in WhatsApp.

Nothing is missing at the moment work happens. Someone is standing in front of it, and they already say so. What's missing is everything that happens to that update afterwards.

Origin
The engineer speaks
Twelve workers, slab shuttering, truck two hours late. Accurate, complete, and said out loud.
Step 1
It lands in a group
Alongside forty other messages that day. Unstructured, unsearchable, unattached to any project record.
Step 2
Someone rebuilds it
A project manager scrolls, calls to clarify, and retypes it into a spreadsheet. Most days. Not every day.
Step 3
The report goes out thin
Delays get dropped first — they're the hardest to reconstruct and the easiest to leave out.
Weeks later
Someone asks for proof
A bill is challenged. A date is disputed. And the only version that existed was in a chat thread nobody kept.
The 52-day gap
Day 0 340m³ poured. Everything is known.
Day 52 Nothing is provable.
Day 4
Photos sink under 900 newer images in the camera roll.
Day 19
The voice note scrolls past in a group carrying 40 messages a day.
Day 33
Rajesh transfers to the Pune site. The context leaves with him.
Day 52 — PMC review
"Insufficient
substantiation."

No contemporaneous records for the 12 March pour. Certified quantity reduced from 340m³ to 290m³.

Certified quantity lost
50m³
≈ ₹4.2L at current RCC rates
Daily Progress Report
Tower A · Block 3 Slab · 12 Mar 2024
Recorded Day 0
Manpower
12 workers · Shuttering (8), Concrete (4)On plan
Activity
Concrete pour · Grid C4–C7 · 340m³ · 09:42–17:30
Delay
Truck 2 hrs late — ACC supplierMaterial deliveryClient-notifiable
Materials
340m³ scheduled · Confirmed 11:40 · Running total: 2,180m³Tracked
Evidence
🎙 09:42 📷 3 photos SHA-256 ✓
Every one of those answers existed on day zero. BrickVox is what keeps them.
The BrickVox way

WhatsApp → Structured record.
In the time it takes to walk to the gate.

Your engineer sends a voice note they were already going to send. BrickVox captures it, structures it, and turns it into permanent project intelligence — automatically.

01
WhatsApp
Voice note, message, or photo. No change in behavior required.
Voice Photo Text
02
BrickVox
Extracts labour, quantities, delays, materials, weather. All structured.
AI extraction Structured data
03
DPR
Professional report generated. Timestamped. Signed. Evidence-attached.
PDF Audit trail
04
Intelligence
Delays tracked. Overbilling caught. Claims pack ready. Portfolio visible.
Claims Portfolio
How it works

A voice note becomes project intelligence,
then a professional DPR.

Your engineers already send WhatsApp updates. BrickVox fits inside that workflow without adding a single extra step.

BrickVox processing graph Live extraction
RS
Site Engineer 16:44
1:52

"Level 4 shuttering completed today. Eight labourers on site. Two mixers used. Cement delivery delayed by one hour."

Processing
Speech-to-Text
Entity Extraction
Schedule Matching
Material Tracking
Risk Detection
Photo Association
Extracting quantities…
Matching contractor…
Checking planned vs actual…
Generating DPR…
Daily Progress Report
Sector 14 Residential · 22 June · Under 60s
WhatsApp PDF delivered
Project Dashboard Live update
Email PDF Sent to team
01
Voice note sent
Engineer sends a WhatsApp voice note

A normal site update is captured exactly where engineers already communicate — with waveform, timestamp, avatar, and duration intact. No app to download. No login. No form.

02
Enters the pipeline
The voice note travels into BrickVox

Speech-to-text, entity extraction, schedule matching, material tracking, risk detection, photo association, and DPR generation run as one controlled pipeline.

03
Intelligence extracted
AI extracts project intelligence

Quantities, contractors, planned-vs-actual status, missing activities, likely delays, and reporting gaps are checked before anything is formatted.

04
DPR published
Messy notes become a professional DPR

Project name, date, weather, activities, labour, equipment, materials, safety, delays, risks, and tomorrow's plan — structured into a professional report and delivered before evening.

The daily progress report

This is what you get.
Every single day.

Not a screenshot. Not a demo. This is the actual structure of every BrickVox DPR — generated from one voice note, delivered before evening.

Project
Tower A — Sector 14
Date
22 Aug 2026
Status
Recorded 09:42 AM
Labour
12 workers
On-site. Slab shuttering gang. Foreman: Ramesh.
On plan
Activity
Slab shuttering
Level 5 soffit. Completion target: Day +3.
In progress
Progress
680 sq ft
Of 1,200 sq ft total. 56.7% complete.
Ahead of plan
Delay Event
Concrete truck
Delayed arrival by 2 hours. ACC supplier. Cascades to 4 PM pour window.
Logged + timed Client-notifiable
Materials
340 m³
Concrete scheduled. Delivery confirmed at 11:40 AM. Running total: 2,180 m³.
Tracked
Weather
Clear
Work proceeding. Rain expected 15:00. Site closure planned if sustained.
No impact
Voice note (0:23)
3 photos attached
Recorded: 09:42 AM
Contemporaneous
Audit hash
SHA-256: a4f2d8e1b3c7...

This is what your engineers produce — automatically, every day.

Download sample DPR (PDF)
Evidence layer

Every day becomes a record.

Build a consistent, traceable record of what happened on site. When disputes start — six months, two years later — the evidence is already organized and ready.

Build a consistent, traceable record of what happened on site.
When disputes start — six months, two years later — the evidence is already organised and ready. Not reconstructed from memory. Not pieced together from chat scrolls.
14 Mar · 10:42 AM
Client drawing revision — slab design
Level 3 progress held pending updated formwork drawings from structural consultant. Engineer noted delay verbally on site call.
19 Mar · 06:15 AM
Site access blocked — client's adjacent works
North wing inaccessible. Client's finishing contractor operating in access corridor. Work shifted to south wing only.
22 Mar · 14:30
Cement delivery delayed — ACC truck breakdown
Material delivery 1 hour late. Pour rescheduled to next window. Lost productive afternoon slot.
25 Mar · 06:00
Heavy rain — site work halted
Monsoon onset. Site closed. Weather data auto-attached from location records. Force majeure documentation auto-filed.
Delay register summary
4.5d
Total delay impact
4
Events logged
100%
Evidence attached
When an EOT claim is disputed or an LD notice arrives, your evidence is already ready. One-click export. No reconstruction from memory.
Build a consistent, traceable record. BrickVox preserves contemporaneous evidence of what happened on site. We make no legal guarantees — but the strength of any claim depends on the quality of the evidence behind it.
Every entry timestamped · SHA-256 audit hash · Photo-backed · Cause-categorized
What the system does with it

One voice note feeds the whole system.

The DPR is the output the engineer sees. Everything below is what you see — automatically built from the same 90 seconds.

01 — Portfolio overview

Every site. One screen.
No morning calls.

The dashboard aggregates every site's DPR status before you start your day. Delivered, missing, flagged — you know which project manager to call before they call you.

Live DPR status across all active projects
30-day reporting trend — success rate by site
Missing report alerts before follow-up starts
No new app — runs on WhatsApp your team already has
Overview of your projects 28 Aug 2026
Active projects
3
DPRs today
3
Pending / Missing
0
Meridian Elite Residences
Whitefield, Bangalore · 3 engineers
● Delivered
Palm Heights Tower B
Dubai Marina, UAE · 3 engineers
● Delivered
NH-48 Service Road Widening
Gurugram, Haryana · 3 engineers
● Delivered
92% on-time · 30-day reporting overview ↗
02 — Delay register

Every delay event.
Timestamped. Attributed. Ready.

When a PMC challenges your RA bill, the delay register is your first line of evidence. Every event is logged the day the engineer speaks it — before anyone knew there would be a dispute.

Cause category — client, material, weather, subcontractor
Voice note source attached to every entry
One-click claims pack export for FIDIC Sub-Cl. 20.1
Engineer speaks it on WhatsApp — register updates automatically
Delay register · Tower A 3 open events
Date Event Cause Impact
12 Mar Concrete truck 2 hrs late — Block 3 Material delivery +2.0 hrs
18 Mar Drawing revision halted slab work Client drawing +1.0 day
24 Mar Rebar delivery 4 hrs late — Tower A Material delivery +4.0 hrs
Total client-caused: 1.67 days · Claim pack ready Export PDF ↓
03 — Weekly AI insight

Patterns your PM
would miss in 30 DPRs.

Every week, BrickVox reads all the DPRs from your site and surfaces what matters: labour trends, recurring delay causes, and whether you're on track. No spreadsheet required.

Risk level — low / medium / high per project
Concrete recommendations from accumulated DPRs
Confidence score — so you know how much to trust it
Summary delivered to owner's WhatsApp every Monday
Weekly AI insight · Tower A 25 Aug 2026
Based on 24 DPRs · last 30 days
Confidence: 91%
Medium risk

Material delivery delays have occurred on 6 of the last 24 reporting days, concentrated on Tuesdays. Labour headcount consistently 12–14% below planned for Block 3 slab pours.

Recommendations
  • Pre-order rebar by Thursday to avoid Tuesday delivery gaps
  • Issue delay notice for 18 Mar drawing revision — client-caused
  • Add 2 labour on Block 3 next pour to meet planned headcount
Days to claim or lose
0
FIDIC Sub-Clause 20.1 window. From the moment the delay is spoken on site.
Per disputed delay
₹8–40L
Withheld without contemporaneous records
One EOT claim lost
₹2.5L+
Typical single EOT claim lost for want of daily records
Net margin erased
4–8%
One unbacked LD notice eliminates a project's entire profit
Who it's for

Four readers. Zero extra effort.

One voice note from one engineer serves four different people — without anyone asking for a report.

Site Engineer

Sends a 90-second voice note

While walking the site. No forms. No typing. No login. Leaves on time. The DPR is done before they reach the gate.

Project Manager

Dashboard complete by 6 PM

Delays tagged before they compound. No PM calls. No Excel. Morning review runs on facts from yesterday, not guesswork.

Owner / Director

Every site's ground truth without travel

Claims pack ready when disputes start. Portfolio risk in one view. Every question about what happened has an answer with a timestamp.

Developer / PMC

Unfiltered progress from every contractor

Verified against photos. Mandate this format in your tender. The data your contractors send becomes instantly auditable.

The sample

Send us today's
voice note.

No signup. No tour. One voice note from a live site. We return the DPR it produces. You decide if it's worth continuing.

What the engineer sends

BrickVox
online · end-to-end encrypted
DPR for 11 Mar ready ✓
View report →
09:31 ✓✓
0:23
17:44 ✓✓
BrickVox
DPR ready — Tower A · 12 Mar
⚠ Delay logged: Concrete truck
View DPR →
17:46

No new app. This is WhatsApp.

What gets generated

Daily Progress Report
Tower A · 12 Mar 2024
Delivered
Labour
12 workers · Shuttering team (8), Concrete (4)
Activity
Concrete pour · Grid C4–C7 · 340m³
Delay
Truck 2 hrs late Logged
Evidence
🎙 09:42 📷 3 photos SHA-256 ✓
Rajesh S. · 17:52 · CPWD format Download PDF ↓

Ready in under 90 seconds from the voice note.

Weekly AI summary to owner

BrickVox
Weekly insight
📊 Weekly insight · Tower A
Material delays on 6 of 24 days — Tuesdays. Labour 12% below plan on Block 3 pours. ⚠ Medium risk
Recommendations
· Pre-order rebar by Thursday
· Issue delay notice — 18 Mar (client)
· Add 2 labour on next Block 3 pour
Mon 09:01
Got it. Calling Rajesh now 👍
09:04 ✓✓

Delivered to your WhatsApp every Monday.

Hopkins's principle: let the product demonstrate itself before you ask for anything in return. The voice note is the demonstration.
Pricing

Less than the cost
of one bad day.

Every paid plan includes a 7-day free trial. No credit card. No annual lock-in. Cancel any time.

Starter
₹14,999
per month

For growing teams that want structured reporting.

  • 2 projects
  • Unlimited engineers
  • Unlimited DPRs
  • Field audit trail (SHA-256)
  • 30-day claims pack
  • Company logo on reports
Pro
₹24,999
per month

For teams that need overbilling protection and legal-grade documentation.

  • 4 projects
  • Unlimited engineers
  • Everything in Starter, plus:
  • Overbilling detection (man-day comparison)
  • BSA Section 63 legal certificate
  • Delay notices & RFI generator
  • CPWD format PDF
Most chosen
Growth
₹39,999
per month

For teams managing multiple projects and sites.

  • 6 projects
  • Unlimited engineers
  • Everything in Pro, plus:
  • Plan variance daily alerts
  • Unlimited claims history
  • Portfolio dashboard across all sites
  • Automation rules & material alerts
Scale
₹69,999
per month

For large teams that need integrations and governance.

  • 10 projects
  • Unlimited engineers
  • Everything in Growth, plus:
  • Construction milestones & plan tracking
  • Weekly AI project insights
  • Labour register
  • Priority support
Core · Free
For individual engineers getting started.
1 projectUnlimited engineers10 DPRs total
Enterprise

For organisations running reporting across regions, joint ventures, or a full contractor panel. Priced per portfolio, with onboarding handled by our team.

7-day free trial on all paid plans · No credit card · Prices exclusive of GST · Cancel any time

Questions

The questions contractors actually ask.

Specific objections. Specific answers. No corporate copy.

Will my site engineers actually use this? They refuse every new app.
They don't touch a new app. They send a WhatsApp voice note — which they're already doing. BrickVox receives it on the other end. From the engineer's perspective, nothing changes. No login. No form. No new habit. The only thing that changes is what happens to the voice note after they send it.
What if the engineer's Hindi or regional language is unclear?
BrickVox uses Sarvam AI — built specifically for Indian languages — for Hindi, Marathi, Tamil, Telugu, Kannada, and Gujarati, combined with OpenAI Whisper for accented English and Arabic. When the transcript is ambiguous, BrickVox flags the specific field rather than guessing, and the confidence score appears on the DPR so your PM knows which entries to verify. Garbage in does not automatically mean garbage out.
We already have Procore / Asite / a project management system. Why add another?
Those systems organise project information after it has been captured. BrickVox handles the missing first mile: site engineers send the WhatsApp voice notes they already use, and BrickVox turns them into structured DPRs and evidence. You can start without an integration. Scale is designed for larger teams that need integrations and governance, while Enterprise supports portfolio-wide onboarding.
How does this actually help when a payment dispute starts?
Starter includes a SHA-256 field audit trail and a 30-day claims pack, creating a traceable record of what was reported and when. Pro adds overbilling detection, delay notices, an RFI generator, and a BSA Section 63 legal certificate. Growth adds unlimited claims history and daily plan-variance alerts. The result is contemporaneous evidence you can retrieve when an RA bill, delay, or scope event is challenged.
How long does it take to set up? We can't afford a 3-month rollout.
You can produce the first DPR the same day. Add a project in the dashboard, share the WhatsApp number with your site engineers, and let them send voice notes as usual. No integration is required to start. Every paid plan has a 7-day free trial with no credit card, so you can test one active project before rolling out across a portfolio.
What happens to our voice notes and site data? Who can see it?
Your data belongs to your organisation — it is never used to train models, never shared between accounts, and never sold. Voice recordings are processed through Sarvam AI or OpenAI Whisper for transcription and then retained on your account only. You can delete any project's entire data history at any time, including all audio, DPRs, and structured records, from the dashboard. The full privacy policy and data deletion instructions are published at brickvox.com/data-deletion.
What does it actually cost, and is there a lock-in?
Core is free for 1 project, unlimited engineers, and 10 DPRs total. Paid plans include unlimited engineers and unlimited DPRs: Starter is ₹14,999/month for 2 projects, Pro is ₹24,999/month for 4, Growth is ₹39,999/month for 6, and Scale is ₹69,999/month for 10. Extra projects can be added to Starter, Pro or Growth at ₹8,999/month each. Every paid plan includes a 7-day free trial with no credit card. Monthly billing has no annual lock-in and can be cancelled any time; annual billing saves 2 months (pay 10, get 12). Prices exclude GST.

See the warning.
Fix the problem.
Avoid the delay.

One site. Seven days to see whether a daily record changes what you can prove.

No app for engineers · No lock-in · Cancel any time